Church Road Improvements

photo credit: Katy Radder

Status: Completed 2014

Construction Cost: $3.6 Million (Federal, TIB, & Local Funding)

Description: R&E’s scope of work included preparing the PS&E, obtaining the required permits, ROW acquisition assistance, utility coordination, and funding administration. The project will widen and reconstruct 3,700 LF of a Collector street, including installation of ADA facilities and bike lanes, sidewalks, bus pull outs, storm drain conveyance, sanitary sewer system, watermain upgrades, relocation of power poles, and installing retaining walls. This project required coordination with public utilities, local residents, and City staff.