Bridge Design and Construction

Status:Completed 2012

Construction Cost: $2.3 Million (Federal)

Description: R&E performed design and construction management for the replacement of the Kok Rd. Bridge over Fishtrap Creek.  The project replaced the existing three span bridge with a 70 foot single span precast concrete girder bridge with cast-in-place concrete deck, supported on cast-in-place concrete piles.  The bridge work also included structural earth walls, approach slabs and installation of water main, gravity sanitary sewer main, sanitary sewer force main, communications conduit, gas main and duct bank installed within the girder bays as well as the construction of drainage improvements and a stormwater facility

© Copyright Reichhardt and Ebe