Trenchless Design and Construction Management

Status: Completed 2009

Construction Cost: Approximately $3.62 Million (local funding)

Trenchless Sewer Installation Costs: Approximately $1.63 Million

Description: The scope of work performed for this project included the design, plan and specification development, contract administration and project inspection of the installation of approximately 4,000 LF of 24-inch and 15-inch vitrified clay sanitary sewer installed utilizing Guide Pilot Tube MicroTunneling.  Additionally, 600 LF of 12-inch HDPE was installed using Horizontal Directional Drilling (HDD) technology.

© Copyright Reichhardt and Ebe