Status: Completed 2007
Construction Cost: $1.6 Million (TIB and local funding)
Team members involved: R&E (Luis Ponce, PM)
Description: R&E prepared PS&E and construction management for channelization, curb, gutter, and sidewalk, pavement markings, traffic signing, illumination, storm and sanitary sewer and water main for an urban single-lane roundabout at the Vista Dr./Malloy Rd./Ferndale Ter. intersection in the City of Ferndale. The project involved roundabout evaluation, roadway realignment and right of way acquisition to combine four existing, closely-spaced intersections into one roundabout intersection, and utility relocation coordination. The ROW required three full takes (2 homes and 1 business), approximately 16 strip takes, and easements from the School District. Located adjacent to the local high school, the roundabout benefits the area with its traffic calming effects.